      reporting: todo  ALL  complete  next up   

  14992 R & M

 
upstairs living blackout curtains complete
deck cable railing complete
2nd floor trim complete
Move glass, copper, toilet off deck complete
strong back helper needed - Ben?
replace window on resilient shed or cover with plastic complete
Check water heater filter 2024-01-01*
seal replaced windows complete
3rd floor E door & deck - postponed 12S23 2024-05-01
Revise Hydronic Furnace 2024-09-01
Fix leaks in woodshed/shop roof 2024-09-15*
check sealant stash; buy at Rossis
clean heat pump filters 2024-10-01*
Check roof for leaks 2024-10-15*
move new rain gauge at same time
Diagnose and fix air leakage SW corner bathroom 2024-11-01
warped window needs knob / hook for closure
Elevator 2024-11-28
build car with Gene
Partial computer room floor 2025-03-31
divider

  15000 Sienna’s

 
Repair screen over foundation vents complete
Replace shower valve innards complete
order innards, recruit Dana
reroute water supply pipe, risers on septic complete
discover north cover; Thompson will install risers when pipe is moved
Check water heater filter 2024-01-01*
Sienna: Finalize drainage from bathroom sink 2024-10-01
ask Clay to help
divider

  14984-A Upstairs

 
Check water heater filter 2024-01-01*
Check and improve sealants on roof 2024-10-01*
Check drainage on chimney drain 2024-10-01*
Clean Heat Pump filters 2024-10-01*
divider

  14984-B SW apartment

 
Install Heat Pump complete
Check water heater filter 2024-01-01*
divider

  14980 Solar Cottage

 
Check water heater filter 2024-01-01*
Check leaking hosebib with cap 2024-09-01
Place metal roof material over roof hatch 2024-10-01
Check seals on solar tubes at same time
Check roof and skylights for leaks 2024-10-15*
clean skylights?
Fasten battery box cover, north side 2024-10-15
Check / Remove nasturiums off of building 2024-10-15*
Finish deck railing 2025-01-15
stainless steel cable
divider

  Annie’s

 
Check water heater filter 2024-01-01*
new front steps, railing 2024-05-20
divider

  Front Yards

 
Clean perimeters to enable ZTR mowing complete
Watertower - cancelled 12S23 2023-01-01
design and form work for northeast pylon
Cut dead trees and embedded re-rod complete
Prune fruit trees 2025-01-01*
divider

  Back Meadow

 
Till radish-infested areas, smooth terrain complete
Sam will till after the first solid rains
Glass shed windows complete
R checks plastic
Cut Cypress stems threatening pumphouse complete
Paulo Andrade (530) 559 2953
Complete first seeding complete
Clean perimeters to enable ZTR mowing complete
Pier and water intake complete
Begin excavation/support infrastructure
New rope for well level indicator/cover 2024-08-01
move concrete cover to NW well
Path, Bridge over pond outlet 2024-09-01
divider

  Pink Cabin

 
Stop shower leak, replace valve innards 2024-07-01
order shower valve innards
divider
status codes
U : Urgent
T : To do
I : In Progress
C : Complete
P : Postponed
X - Canceled
* Annual tasks