Property To-Do ListManual index |
14992 R & M |
|||
upstairs living blackout curtains | complete | ||
deck cable railing | complete | ||
2nd floor trim | complete | ||
Move glass, copper, toilet off deck | complete | ||
strong back helper needed - Ben? | |||
replace window on resilient shed or cover with plastic | complete | ||
Check water heater filter | 2024-01-01* | ||
seal replaced windows | complete | ||
3rd floor E door & deck - postponed 12S23 | 2024-05-01 | ||
Revise Hydronic Furnace | 2024-09-01 | ||
Fix leaks in woodshed/shop roof | 2024-09-15* | ||
check sealant stash; buy at Rossis | |||
clean heat pump filters | 2024-10-01* | ||
Check roof for leaks | 2024-10-15* | ||
move new rain gauge at same time | |||
Diagnose and fix air leakage SW corner bathroom | 2024-11-01 | ||
warped window needs knob / hook for closure | |||
Elevator | 2024-11-28 | ||
build car with Gene | |||
Partial computer room floor | 2025-03-31 | ||
15000 Sienna’s |
|||
Repair screen over foundation vents | complete | ||
Replace shower valve innards | complete | ||
order innards, recruit Dana | |||
reroute water supply pipe, risers on septic | complete | ||
discover north cover; Thompson will install risers when pipe is moved | |||
Check water heater filter | 2024-01-01* | ||
Sienna: Finalize drainage from bathroom sink | 2024-10-01 | ||
ask Clay to help | |||
14984-A Upstairs |
|||
Check water heater filter | 2024-01-01* | ||
Check and improve sealants on roof | 2024-10-01* | ||
Check drainage on chimney drain | 2024-10-01* | ||
Clean Heat Pump filters | 2024-10-01* | ||
14984-B SW apartment |
|||
Install Heat Pump | complete | ||
Check water heater filter | 2024-01-01* | ||
14980 Solar Cottage |
|||
Check water heater filter | 2024-01-01* | ||
Check leaking hosebib with cap | 2024-09-01 | ||
Place metal roof material over roof hatch | 2024-10-01 | ||
Check seals on solar tubes at same time | |||
Check roof and skylights for leaks | 2024-10-15* | ||
clean skylights? | |||
Fasten battery box cover, north side | 2024-10-15 | ||
Check / Remove nasturiums off of building | 2024-10-15* | ||
Finish deck railing | 2025-01-15 | ||
stainless steel cable | |||
Annie’s |
|||
Check water heater filter | 2024-01-01* | ||
new front steps, railing | 2024-05-20 | ||
Front Yards |
|||
Clean perimeters to enable ZTR mowing | complete | ||
Watertower - cancelled 12S23 | 2023-01-01 | ||
design and form work for northeast pylon | |||
Cut dead trees and embedded re-rod | complete | ||
Prune fruit trees | 2025-01-01* | ||
Back Meadow |
|||
Till radish-infested areas, smooth terrain | complete | ||
Sam will till after the first solid rains | |||
Glass shed windows | complete | ||
R checks plastic | |||
Cut Cypress stems threatening pumphouse | complete | ||
Paulo Andrade (530) 559 2953 | |||
Complete first seeding | complete | ||
Clean perimeters to enable ZTR mowing | complete | ||
Pier and water intake | complete | ||
Begin excavation/support infrastructure | |||
New rope for well level indicator/cover | 2024-08-01 | ||
move concrete cover to NW well | |||
Path, Bridge over pond outlet | 2024-09-01 | ||
Pink Cabin |
|||
Stop shower leak, replace valve innards | 2024-07-01 | ||
order shower valve innards | |||
Nimda content administration system written by Michael Potts file updated copyright © 2003-2024 Caspar Institute | |
this site generated with 100% recycled electrons |