Caspar Institute logo

Property To-Do List

Manual index 


      reporting: todo  all  complete  NEXT UP   

NEXT UP TODOS

15kCheck water heater filter 2024-01-01*
 
AnnieCheck water heater filter 2024-01-01*
 
CottageCheck water heater filter 2024-01-01*
 
RandMCheck water heater filter 2024-01-01*
 
SWCheck water heater filter 2024-01-01*
 
UPCheck water heater filter 2024-01-01*
 
Annienew front steps, railing 2024-05-20
 
pinkStop shower leak, replace valve innards 2024-07-01
 order shower valve innards
backNew rope for well level indicator/cover 2024-08-01
 move concrete cover to NW well
backPath, Bridge over pond outlet 2024-09-01
 
CottageCheck leaking hosebib with cap 2024-09-01
 
RandMFix leaks in woodshed/shop roof 2024-09-15*
 check sealant stash; buy at Rossis
15kSienna: Finalize drainage from bathroom sink 2024-10-01
 ask Clay to help
CottagePlace metal roof material over roof hatch 2024-10-01
 Check seals on solar tubes at same time
RandMclean heat pump filters 2024-10-01*
 
UPClean Heat Pump filters 2024-10-01*
 
UPCheck drainage on chimney drain 2024-10-01*
 
UPCheck and improve sealants on roof 2024-10-01*
 
CottageFasten battery box cover, north side 2024-10-15
 
CottageCheck / Remove nasturiums off of building 2024-10-15*
 
CottageCheck roof and skylights for leaks 2024-10-15*
 clean skylights?
RandMCheck roof for leaks 2024-10-15*
 move new rain gauge at same time
RandMDiagnose and fix air leakage SW corner bathroom 2024-11-01
 warped window needs knob / hook for closure
RandMElevator 2024-11-28
 build car with Gene
frontPrune fruit trees 2025-01-01*
 
CottageFinish deck railing 2025-01-15
 stainless steel cable
RandMPartial computer room floor 2025-03-31
 
divider
status codes
U : Urgent
T : To do
I : In Progress
C : Complete
P : Postponed
X - Canceled
* Annual tasks





Nimda content administration system
written by Michael Potts

file updated
copyright © 2003-2024 Caspar Institute
this site generated with 100% recycled electrons