Caspar Institute logo

Property To-Do List

Manual index 


      reporting: todo  all  COMPLETE  next up   

  14992 R & M

 
upstairs living blackout curtains complete
deck cable railing complete
2nd floor trim complete
Move glass, copper, toilet off deck complete
strong back helper needed - Ben?
replace window on resilient shed or cover with plastic complete
seal replaced windows complete
3rd floor E door & deck - postponed 12S23 2024-05-01
Revise Hydronic Furnace 2024-09-01
divider

  15000 Sienna’s

 
Repair screen over foundation vents complete
Replace shower valve innards complete
order innards, recruit Dana
reroute water supply pipe, risers on septic complete
discover north cover; Thompson will install risers when pipe is moved
divider

  14984-A Upstairs

 
divider

  14984-B SW apartment

 
Install Heat Pump complete
divider

  14980 Solar Cottage

 
divider

  Annie’s

 
divider

  Front Yards

 
Clean perimeters to enable ZTR mowing complete
Watertower - cancelled 12S23 2023-01-01
design and form work for northeast pylon
Cut dead trees and embedded re-rod complete
divider

  Back Meadow

 
Till radish-infested areas, smooth terrain complete
Sam will till after the first solid rains
Glass shed windows complete
R checks plastic
Cut Cypress stems threatening pumphouse complete
Paulo Andrade (530) 559 2953
Complete first seeding complete
Clean perimeters to enable ZTR mowing complete
Pier and water intake complete
Begin excavation/support infrastructure
divider

  Pink Cabin

 
divider
status codes
U : Urgent
T : To do
I : In Progress
C : Complete
P : Postponed
X - Canceled
* Annual tasks





Nimda content administration system
written by Michael Potts

file updated
copyright © 2003-2024 Caspar Institute
this site generated with 100% recycled electrons