  14992 R & M

 
Check water heater filter 2024-01-01*
Fix leaks in woodshed/shop roof 2024-09-15*
check sealant stash; buy at Rossis
clean heat pump filters 2024-10-01*
Check roof for leaks 2024-10-15*
move new rain gauge at same time
Diagnose and fix air leakage SW corner bathroom 2024-11-01
warped window needs knob / hook for closure
Elevator 2024-11-28
build car with Gene
Partial computer room floor 2025-03-31
divider

  15000 Sienna’s

 
Check water heater filter 2024-01-01*
Sienna: Finalize drainage from bathroom sink 2024-10-01
ask Clay to help
divider

  14984-A Upstairs

 
Check water heater filter 2024-01-01*
Check and improve sealants on roof 2024-10-01*
Check drainage on chimney drain 2024-10-01*
Clean Heat Pump filters 2024-10-01*
divider

  14984-B SW apartment

 
Check water heater filter 2024-01-01*
divider

  14980 Solar Cottage

 
Check water heater filter 2024-01-01*
Check leaking hosebib with cap 2024-09-01
Place metal roof material over roof hatch 2024-10-01
Check seals on solar tubes at same time
Check roof and skylights for leaks 2024-10-15*
clean skylights?
Fasten battery box cover, north side 2024-10-15
Check / Remove nasturiums off of building 2024-10-15*
Finish deck railing 2025-01-15
stainless steel cable
divider

  Annie’s

 
Check water heater filter 2024-01-01*
new front steps, railing 2024-05-20
divider

  Front Yards

 
Prune fruit trees 2025-01-01*
divider

  Back Meadow

 
New rope for well level indicator/cover 2024-08-01
move concrete cover to NW well
Path, Bridge over pond outlet 2024-09-01
divider

  Pink Cabin

 
Stop shower leak, replace valve innards 2024-07-01
order shower valve innards
divider
status codes
U : Urgent
T : To do
I : In Progress
C : Complete
P : Postponed
X - Canceled
* Annual tasks





Nimda content administration system
written by Michael Potts

file updated
copyright © 2003-2024 Caspar Institute
this site generated with 100% recycled electrons